What we work on

Technical review, in four modules

A data room, a set of plans, a maintenance history, photographs — read by someone who has stood in enough buildings to know what the documents are not saying. An asset in Germany is as accessible as one an hour from here.

Module ARemote

Data-room review

A structured read of the seller's documentation: what is there, what is missing, what contradicts itself, and which gaps a buyer's advisor will find first.

Where the value isEvery gap in the data room becomes an open point, and every open point becomes a price argument. Closing the list before the other side builds it protects both the price and the timetable.

Feefrom €3,000 (USD 3,500) · 5 working days

Details
Module BRemote

Red-flag screening

Triage across a shortlist before anyone travels. Each asset comes back as go, no-go, or go-but-request-these-documents-first, with the technical reasoning behind it.

Where the value isSite visits and advisor hours are the expensive part of a selective market. This decides which assets deserve them.

Fee€900 (USD 1,050) per asset · 5 working days for up to 5 assets

Details
Module CRemote + site visit

Full technical due diligence

Condition, maintenance backlog, building services and CapEx over a defined horizon, for single assets and portfolios. Findings are written so they can be carried straight into a valuation as a deduction, not as a separate narrative.

Where the value isTechnical work and the valuation number are usually commissioned apart and never meet. This is the module that joins them.

Feefrom €7,200 (USD 8,400) · draft 15 working days after site visit

Details
Module DRemote

Second opinion

A plausibility check on a technical report or a refurbishment cost estimate produced by someone else: assumptions, unit rates, what the scope quietly leaves out.

Where the value isA short, cheap check on a number that is about to carry a much larger decision.

Feefrom €1,200 (USD 1,400) · 5 working days

Details

Beyond the transaction: Project monitoring for acquirers and lenders during construction, and development and deal structuring for capital that has the money but not the build-side know-how.

How we work

01

Fixed fee, fixed turnaround

Scope, exclusions and delivery date are agreed before the work starts. No hourly drift.

02

Independent

No commission from any side of a transaction, and no fee that depends on the outcome. The report states findings, not recommendations.

03

Project by project

Technical capacity without a hire — including as a subcontractor under another firm's mandate, reporting in that firm's format.

Behind it

Senior TDD
5 years, Duff & Phelps REAG (now Kroll), Berlin
Asset classes
Logistics, office, retail — single assets and portfolios
Project monitoring
For acquirers, up to approx. €35M
Working languages
German, English, Spanish

Capability brief

The same on one page

The four modules, how we work and the scope note as a one-page A4 PDF — to forward, attach or print.

Download PDF1 page · A4 · English

Remote modules are based on the documentation and image material provided. They do not include a site inspection or the opening of building components, and they are not a valuation.

Let's Talk

Start with what is in the data room

A short description of the asset, the transaction and the documentation available is enough to agree scope, fixed fee and turnaround.